Date |
Line |
|
Notes |
01-06-2023 | 1 | | ID #0200746
BEGINNING: 2.84 AC ENDING: 2.84 AC
1) AC |
01-06-2023 | 2 | | STAYS THE SAME
2) CHNG DESC TO TRACT 1 DUKE ENERGY PROGESS, LLC |
01-06-2023 | 3 | | & THE LAURIE STECKLER CORP BM 2022 PG 2082 |
10-20-2022 | 1 | | REBATE TV 87,120 F'22/SPLIT F'22/JBW |
10-19-2022 | 1 | | ID# 0200746 START AC: 10.44 FINAL AC: 10.76
1. |
10-19-2022 | 2 | | AC CORR TO 10.76 AC PER DB 12880-966
NOTE: FOUND WHEN WORKING |
10-19-2022 | 3 | | ON NC540 & MORRISVILLE PKWY EXT R/WS |
10-19-2022 | 4 | | VALUE CHANGED BY PTC-09PTC371-CONSENT ORDER ENTERED 10/22/10 |
10-19-2022 | 5 | | REBATE TV 396,720 F'10 & 09/VALUE CHANGED BY PTC/09 PTC 371 |
10-19-2022 | 6 | | CONSENT ORDER ENTERED 10-22-10/MMF |
10-19-2022 | 7 | | (148-24.3)BOE CHANGE |
10-19-2022 | 8 | | 11-14-96/GS(17.41AC)SPLIT .25AC TO SM PT LTS 2 & 3 THE OVERLOOK |
10-19-2022 | 9 | | SUB BM96-1235 F97/MLL |
10-19-2022 | 10 | | 6.72ac into western wake expressway r/w per dot hwy project |
10-19-2022 | 11 | | r2635(#920)and db12128-2674 |
10-19-2022 | 12 | | SPLT FROM ID15504(513-4) F94/OLH(NON-CONTIGUOUS PAR DUE TO SPLT |
10-19-2022 | 13 | | TO ID0200745(CARY CORP LMTS ANNEXATION) |
10-19-2022 | 14 | | 6.06AC INCLUDED IN WESTERN WAKE EXPRESSWAY RD CORRIDOR F94/OLH |
10-19-2022 | 15 | | APPEAL WITHDRAWN-AGREED TO CONSENT VALUE ON 3-21-94 F94/OLH |