Date |
Line |
|
Notes |
02-26-2008 | 1 | | RESULT LETTER PRINTED |
02-19-2008 | 1 | | APPEAL CLOSED |
02-19-2008 | 1 | | IH-C/GC/SDK/02-19-08/GRADE FACTOR INCORRECTLY ASSIGNED |
01-02-2008 | 1 | | EXCLUSION APPLICATION REQUESTED |
01-02-2008 | 1 | | EXCLUSION APPLICATION REQUESTED |
12-12-2003 | 1 | | 12-12-03/BJO/REBATE TV$8,022 F2003/FIRE DAMAGE PER FLD CK/SDK |
12-09-2003 | 1 | | 12-09-03/SDK/FIRE DMG NOT FULLY REPAIRED1-1-03 5% MRKT COR CKBK |
06-12-2003 | 1 | | 6-4-03/DDW/NOAH/HSE REBUILT F2003 (1-8-03/REMEASURED-MSMTS FOR |
06-12-2003 | 2 | | MAIN, DK & OP CHG/TURN SKETCH 45%-FRONT OF HSE IS CURRENTLY |
06-12-2003 | 3 | | RACING THE LEFT SIDE OF LOT/CHG EFF YR/REMOVE UNF ATTIC |
03-22-2002 | 1 | | BLDG PERMIT #16100 ISSUE DATE 1-18-02 CONST TYPE R $80,000 |
02-28-2002 | 1 | | 1-2-02/SDK/NOAH/HSE BURNED 10% VAL F2002 |
02-10-1997 | 1 | | 6-20-96/MWR/ZONING CHG FROM R4 TO R2 (Z-94-95)NCIV F96/UAS |